Staged filtration
Specify pre-filtration and final filtration according to contaminants, airflow and the required air quality.
G4 and HEPA filtration for production facilities, commercial ventilation and controlled environments in Indonesia. Explore duct integration and central EM40000D / EM50000D air-treatment systems.
G4 pre-filtration, HEPA filtration and central fresh-air systems, configured to your application. Selection starts with the application, not a model number.
Specify pre-filtration and final filtration according to contaminants, airflow and the required air quality.
Consider filter access, housing integrity, pressure drop and the available fan performance.
Plan access for inspection and filter replacement, with maintenance requirements included at handover.
Floor-standing fresh-air treatment, with a central cabinet format designed into the wider air-distribution system.

Filtration components. The final arrangement is defined for the selected system.
Noise rating: 80 dB(A). Confirm measurement conditions for the selected model.
380 V / 50 Hz / three-phase supply. Modbus control provision, subject to interface confirmation.
Noise rating: 81 dB(A). Confirm measurement conditions for the selected model.
380 V / 50 Hz / three-phase supply. Modbus control provision, subject to interface confirmation.
Confirm the selected model’s approved datasheet, design conditions, filter documentation and control interfaces before specification.
Bring the airflow, available pressure and air-quality objective.
We’ll develop the equipment and installation scope around them.
Filter classification, selected media and verification requirements are confirmed for the project.
Discuss your projectOwners, consultants and contractors can define supply responsibilities, installation interfaces and the agreed testing and handover requirements with Drytronics.
Discuss the operating conditions and site constraints before finalizing equipment. Explore the relevant industry context below.
Discuss your applicationSelect filtration stages around the contaminants and required air quality.
Coordinate filtration with air handling and the project specification.
Review airflow, available fan pressure and filter replacement access.
Confirm the required filter classification, sealing and verification scope.
The contaminants to manage and the required filter classification or project standard.
Design airflow, allowable pressure drop and available fan capacity.
Duct dimensions, housing location, sealing requirements and service access.
Applicable verification requirements, replacement strategy and operating documentation.
Model capacities, dimensions, electrical characteristics and performance data are confirmed against selected equipment and design conditions.
HVAC design-build for PT Ultrajaya Milk Industry Tbk at its Cikarang MM2100 facility.
Pre-filters and final filters have different duties. Selection should consider the contaminants, target air quality, required classification, airflow and pressure drop. The applicable standard and selected filter data are confirmed in the technical review.
The existing fan capacity, duct dimensions, housing integrity and maintenance access must be checked. Adding a filter changes system resistance, so suitability needs to be reviewed before specifying the retrofit.
Yes. The agreed scope can include filtration selection, equipment supply and duct or housing integration. Testing, replacement access and handover documentation are defined for the project.