Data-center dehumidification in Indonesia.
Humidity control for critical technical environments, from equipment selection to coordinated installation and handover.
A humidity strategy starts with the site.
For a data-center project, room conditions and moisture loads need to be considered alongside the cooling and ventilation design. We work with owners, consultants and contractors to define the dehumidification duty, operating conditions and interfaces before selecting equipment.
Discuss your application
The details that shape
the right solution.
Design basis
Share the required temperature and humidity range, room volume, outside-air provision and operating schedule.
System interfaces
Review ductwork, available static pressure, drainage, electrical supply, controls and maintenance access.
Acceptance and handover
Agree testing, commissioning checks and documentation against the approved project scope.
DCI Indonesia
Explore dehumidifier supply and integration across DCI facilities.
